中日韩AV网站秋霞在线一区二区,日韩精品久久久久久免费,人人看人人玩日韩人妻第一页,国产国拍精品亚洲

Welcome to SHENZHEN YLZ ?TECHNOLOGY CO.,LTD.
Hotline
0755-89328605

Industry news

News

Industry news

Transformer production process and process

2021-03-18 01:12:16   Visit:478

In many electronic application scenarios, people will use various types of transformers, whether it is a high-frequency transformer or a low-frequency transformer, the manufacturing process is similar. The following is a senior design engineer Zou Gong of Shenzhen Yingzhe Technology Co., Ltd. to introduce the general production process of transformers?

1: Prepare the corresponding specification drawings required for production.

2: Prepare the materials required for production, verify the specifications of each material, and the manufacturer.

3: According to the order quantity and quality inspection standards, the samples will be made before production and will be handed over to the technical department to confirm the performance and craftsmanship.

4: Start batch production after confirming the qualification.

1) Remove the extra stitches on the skeleton according to the drawings.

2) Winding.

3) Remove the thread or solder the corresponding tap.

4) Tin plating.

5) Magnetic core assembly.

6) Initial test.

7) Impregnation.

8) High pressure test.

9) Finished test.

10) Labeling.

11) External inspection.

12) Quality inspection.

13) Packed and shipped.

For more knowledge about transformers, you can consult MR Zou, a senior design engineer at Shenzhen Yingzhe Technology Co., Ltd.

主站蜘蛛池模板: 米脂县| 亳州市| 深州市| 顺昌县| 县级市| 宁安市| 南召县| 太和县| 瓦房店市| 饶河县| 平谷区| 隆子县| 东乡县| 巍山| 云霄县| 环江| 阆中市| 黑河市| 定陶县| 沙雅县| 崇仁县| 新郑市| 北海市| 宣化县| 儋州市| 金秀| 南开区| 刚察县| 清水河县| 韶关市| 清水河县| 林甸县| 辽阳市| 太湖县| 蒙山县| 宝丰县| 广宁县| 宜良县| 靖边县| 文山县| 永德县|